The Photovolatic System Installation- page two
While we were having a rainy spell, I focused on the wiring inside the house.  Here is a photo of the completed work showing the DC disconnect, the inverters, the AC panel and meter.  From here, the power just goes into our main electical panel.
On July 1st, Matt and Bryan helped install the panels on the second array.  I made the final electrical connections and tested the system.  Art inspected things on July 3rd, and the electrical inspector did his final inspection on July 5th. 
So, here is a photo Art took of Wendy and I in front of the completed arrays.